News
17 March 2020

USTDA backs coalbed methane-fuelled power plant

In:
Traditional energy

Kalahari Energy Botswana has been awarded a grant by the US Trade and Development Agency (USTDA) to conduct a feasibility study for a 100MW indigenous coalbed methane-fired power project in the Central Kalahari Karoo Basin. Kalahari Energy has selected US-based Advanced Resources International to conduct the study.

You might also like


Video
26 May 2026

Bridging the Perception Gap: How ATIDI Supports Investment...

ATIDI has evolved from a political risk insurer into a Pan-African development catalyst - unlocking capital across infrastructure, energy, agribusiness and digital trade. This...

Perspective
29 May 2026

Imperative’s spekboom 2: A new capital stack for ecosystem...

Imperative’s second-phase spekboom project combines a four-investor carbon financing, a 14-year World Bank outcome bond and long-term offtake with Amazon. It points towards...